select a product:
areas of expertise:
 


RECENT PROJECTS

Prime Pump Co. Pty Ltd has been involved in a broad range of applications in the past.
Notable amongst these are:

  • Northwest Queensland underground dewatering at 80 ltr/sec against a total head of 680mtrs.
  • Northwest Queensland mine perimeter borehole dewatering total flow of 170 ltr/sec @ total head of 490mtrs.
  • Pacific nation mine pit dewatering 760 ltr/sec @ total head of 200mtrs.
  • Queensland mine and township water supply 1900 mts/sec @ 23mtrs total head.
  • Pacific nation gold mine trialing and installing 15 of 145mm shaft diameter slurry seals with
    downstream process and maintenance savings that continue to exceed expectations.
Pontoon mounted town water supply. Large mine dewatering system PNG. Specialised Centrilift equipment for hot bore installation on packer system.
Trailer mounted solar pump. Belt Drive Orion Pump Set. Specialised bore pumping installation on remote mine site.
Diesel Super-Tital pump set mounted on base frame NQ Pontoon-mounted pump pre-submergance Central Qld coal mine remote pump station
Containerised fire systems Helical rotor pump with hopper Supply and installation of remote pump station